Facts and Figures

Client
Felixstowe Dock and Railway Company

Period
2008-2010

Location
Felixstowe, Suffolk

Contractor
Costain Ltd, with Westminster Dredging Company Ltd as subcontractor

Felixstowe South Reconfiguration

Capital dredging and filling works for new quay development (Previously known as Landguard Redevelopment). Phase 1 of the reconfiguration programme consists of 730 m new deep water quay and 200,000 m² container handling area achieved by installing new quay in front of old Landguard port structures and redevelopment of the old Landguard terminal.

Work for WDC included dredging approximately 6.1 million cubic metres consisting of:

-       Dredging of silts and soft clays within reclamation terminal footprint (approx. 750,000m³)

-       Reclamation works to fill the area between the present quay and future quay wall including former Felixstowe Dock Basin (approx. 3,000,000m³ including 500,000m³ re-use material from channel widening).

-       Dredging/widening of western section of the approach channel (2,000,000m3 including 500,000m³ re-use material).

-       Dredging of deep water berth pocket in front of the new quay wall (345,000m³).

-       Dredging of future tug berth pockets (50,000m³).

The design of the project including various stages of the dredging and reclamation works as well as the sequencing of the quay wall installation ensured stability and secure work area throughout the project and resulted in a successful product for the end users delivered on time.